Factory Cheap Hot Pre Galvanized Square Steel Tube - scaffolding couplers – Minjie

Short Description:

Product Detail

Product Tags

Related Video

Feedback (2)

Fast and fantastic quotations, informed advisers to help you choose the correct products that suits all your needs, a short manufacturing time, responsible good quality control and distinct companies for paying and shipping affairs for Steel Walk Boards , Rectangular Tube Steel Sizes , Steel Square Tube Sizes , On account of superior excellent and aggressive rate , we will be the sector leader, make sure you don’t hesitate to contact us by cellular phone or email, if you're fascinated in almost any of our items.
Factory Cheap Hot Pre Galvanized Square Steel Tube - scaffolding couplers – Minjie Detail:

The product name

scaffolding couplers

The product description

1. Product name&size:Scaffold coupler&accessories

2. Classify&size:

British pressed double coupler&48.3mm/0.87kg;

british pressed swivel coupler&48.3mm/1.04kg;

british sleeve coupler&48.3mm/1.0kg;

british inner joint pin&48.3mm/0.84kg;

jis pressed double coupler&48.6mm/0.68kg;

jis pressed swivel coupler&48.6mm/0.68kg;

pressed putlog coupler&48.3mm/0.63kg;

limpt coupler&48.3mm/0.38kg;

fencing coupler;

half coupler;

roofing coupler;

ladder clamp;

Girder coupler;

Swivel girder coupler;

U-type coupler;

Drop forged half coupler;

British drop forged double coupler;

British drop forged swivel coupler;

Drop forged joint pin;

Drop forged putlog coupler;

German drop forged swivel coupler;

German drop forged double coupler;

Board retaining coupler;

From-tie;

Washer plate;

0.43KG;

Hexagonal long nut;

Clamp hook;

Steel cone;

Spring clamp;

Water stop;

Rapid clamp

3. Material:Q235 steel

4. Surface   treatment:Hot dip   galvanized, Powder coated, Painted

5.Color:Accolding to demand

6.Used:building industry

 

Product display

 dasdas (1) dasdas (2) dasdas (7) 

Trading information

The measuring unit:tons

Fob price:450—690

Minimum order quantity :25tons

Method of payment: L/C,D/A,D/P,T/T,Western Union

MoneyGram

Logistics information

Port :Tianjin

Supply ability:2000tons/month

Packing :P acked in bundle,suitable for sea transport(by container)

Our company

dsadas (1) dsadas (2) dav hdr

Our certifications

fasfsdfsdfsdf ffdsfgsdfsdf fdsfsdfsdggsd

Customer photo

dsadasdfas dsadasdasdsd

FAQ

Q: Are you trading company or manufacturer ?

A: We are factory.

 

Q: What are you main market areas and countries ?

A:  We have extended our sales net to almost all over of the world, such as the Southeast Asia, Australia, America, Canada, Europe, Middle East, 
Africa and many other countries and areas.

 

Q: Do you provide samples ? How long will the delivery date ?

A: Yes, generally the samples will be sent out immediately by the air express in 3~5 days,if the goods are in stock . Normally ,delivery date will be within 20 days or according to your order .  

 

Q: What is your terms of payment ?

A: Usually 30% as deposit ,70%before shipment bu T/T. Western union acceptable for small account ,and L/C acceptable for large amount . 

 


Product detail pictures:

Factory Cheap Hot Pre Galvanized Square Steel Tube - scaffolding couplers – Minjie detail pictures

Factory Cheap Hot Pre Galvanized Square Steel Tube - scaffolding couplers – Minjie detail pictures

Factory Cheap Hot Pre Galvanized Square Steel Tube - scaffolding couplers – Minjie detail pictures

Factory Cheap Hot Pre Galvanized Square Steel Tube - scaffolding couplers – Minjie detail pictures

Factory Cheap Hot Pre Galvanized Square Steel Tube - scaffolding couplers – Minjie detail pictures

Factory Cheap Hot Pre Galvanized Square Steel Tube - scaffolding couplers – Minjie detail pictures

Factory Cheap Hot Pre Galvanized Square Steel Tube - scaffolding couplers – Minjie detail pictures

Factory Cheap Hot Pre Galvanized Square Steel Tube - scaffolding couplers – Minjie detail pictures


Related Product Guide:
Dalian iron ore rises on expected post-holiday restocking | Agricultural Commodities | Thick Wall Rectangular Tube
TEPCO Starts Fukushima Ice Wall Construction | Scaffolding Gi Pipe

Well-run products, skilled income group, and better after-sales products and services; We have been also a unified massive family, all people stick with the business price "unification, dedication, tolerance" for Factory Cheap Hot Pre Galvanized Square Steel Tube - scaffolding couplers – Minjie , The product will supply to all over the world, such as: Finland, Luxembourg, Russia, Our company is continuing to serve customers with high quality, competitive price and timely delivery. We sincerely welcome friends from all over the world to cooperate with us and enlarge our business. If you are interested in our products, please feel free to contact us. We would love to provide you with further information.
  • Sales manager is very enthusiastic and professional, gave us a great concessions and product quality is very good,thank you very much!
    5 Stars By Kim from Adelaide - 2016.06.22 12:49
    This supplier stick to the principle of "Quality first, Honesty as base", it is absolutely to be trust.
    5 Stars By Elva from Rotterdam - 2015.12.05 13:53
    Write your message here and send it to us