Construction Building Materials Galvanized Steel Pipe,Galvanized Pipe,Steel Scaffolding Pipe

Short Description:

Product Detail

Our Advantages

Product Tags

Dedicated to strict quality control and thoughtful customer service, our experienced staff members are always available to discuss your requirements and ensure full customer satisfaction for Construction Building Materials Galvanized Steel Pipe,Galvanized Pipe,Steel Scaffolding Pipe, We acquire high-quality as the foundation of our results. Thus, we focus over the manufacture on the finest top quality goods. A strict quality management system has been created to guarantee the caliber of the merchandise.
Dedicated to strict quality control and thoughtful customer service, our experienced staff members are always available to discuss your requirements and ensure full customer satisfaction for Construction Building Materials Galvanized Steel Pipe, Galvanized Pipe, Steel Scaffolding Pipe, We insist on “Quality First, Reputation First and Customer First”. We are committed to providing high-quality solutions and good after-sales services. Up to now, our merchandise have been exported to more than 60 countries and areas around the world, such as America, Australia and Europe. We enjoy a high reputation at home and abroad. Always persisting in the principle of “Credit, Customer and Quality”, we expect cooperation with people in all walks of life for mutual benefits.
The product description:

Product name Hot Dip Galvanized Steel Pipe/Pre-Galvanized Steel Pipe
Wall Thickness 0.6mm–20mm
Length 1–14mAccording to customer requirements …
Outer Diameter 1/2’’(21.3mm)—16’’(406.4mm)
Tolerance Tolerance based on Thickness:±5~±8%  
Shape Round
Material Q195—Q345,10#,45#,S235JR,GR.B-D,STK500,BS1387……
Surface treatment Galvanized
Zinc coating Pre-galvanized steel pipe :40–220G/M2Hot dip galvanized steel pipe :220–350G/M2
Standard ASTM,DIN,JIS,BS
Certificate ISO,BV,CE,SGS
Payment terms 30%T/T deposit in advance,70%balance after B/L copy;100%Irrevocable L/C at sight,100% Irrevocable L/C after receive B/L copy 20–30days
Delivery times 25days after receive ur deposits
Package
  1. Through a bundle
  2. According to customer’s requirement
Loading port Tianjin/Xingang

customer’s benefit:

  What benefits do customers get:

1.we are factory .( our price will have an advantage over trading companies.)

2.Don’t worry about the delivery date . we are sure to deliver the goods in time and quality to achieve customer satisfaction .

Product detail :

860193995952846261(1) 895577370824788430(1) 9
Thickness Length Diameter

 

镀锌带锌层(1) 热镀锌锌层(1) 1 (2)

 gi pipe  zinc coating

 HDG pipe Zinc coating

diameter detail

Different from other factories:

    1.we applied for received 3 patents .(Groove pipe ,Shoulder pipe,Victaulic pipe )

    2. Port : our factory just 40 kilometers from Xingang port ,is biggest port in the north of China .

    3.Our manufacturing equipment include 4 pre-galvanized products lines,8 ERW steel pipe product lines,3 hot-dipped galvanized process lines.

Packing and transport:

Loading picture from Nina                 常用3

Customer case:

  Australian customer purchase powder coating pre galvanized steel square tube. After customers receives the goods for the first time . Customer tests adhesive strength between the powder and the surface of the square tube .Customers test powder and square surface adhesion is small . We have meetings with customers to discuss this problem and we do tests all the time . we polished the surface of the square tube . Send the polished square tube to the heating furnace for heating . We tests all the time and discuss with customer all the time . We keep finding ways . After many tests, the final customer is very satisfied with the products. Now customer purchase a large number of products from factory every month .

Customer photos :

10 4 3

 The customer purchased steel pipes in our factory. After the goods were produced, the customer came to our factory for inspection.


  • Previous:
  • Next:

  • Our Advantages :

    1.we are the source manufacturer .

    2.Our factory is near the port of Tianjin.

    3.To ensure the quality of our products, we use high quality materials and strict quality control

    Payment Term :

    1.30% deposit then 70% balance after received the BL copy
    2.100% at sight Irrevocable letter of credit
    Delivery time: within 15-20 days after received the deposit
    Certificate : CE,ISO,API5L,SGS,U/L,F/M