Factory Price For China Gi Pipe Scafolding Tube Galvanized Pipe Threaded Steel Scaffolding Pipe

Short Description:

Product Detail

Our Advantages

Product Tags

We thinks what clients think, the urgency of urgency to act inside the interests of a customer position of basic principle, allowing for much better high quality, reduce processing costs, charges are additional reasonable, won the new and previous customers the support and affirmation for Factory Price For China Gi Pipe Scafolding Tube Galvanized Pipe Threaded Steel Scaffolding Pipe, By way of more than 8 years of business, we’ve got accumulated rich experience and advanced technologies while in the generation of our items.
We thinks what clients think, the urgency of urgency to act inside the interests of a customer position of basic principle, allowing for much better high quality, reduce processing costs, charges are additional reasonable, won the new and previous customers the support and affirmation for China HDG Gi Pipe, Scafolding Tube Galvanized, Now we are sincerely consider to grant brand agent in different areas and our agents’ maximum margin of profit is the most important thing we care about. Welcome all of the friends and customers to join us. We are ready to share win-win corporation.

The product name

Hot dipped galvanized steel pipe

The product description

SteelGrade:Q195–Q345,S235JR,S275JR,S355JR,GR.B-D,STK500

Standard:GB/T3091–2001,BS1387–1985,DIN EN10025,EN10219,JIS G3444:2004,ASTMA53 SCH40/80/STD,BS-EN10255-2004

Surface Finish:hot dipped galvanized ,electro galvanized ,black,painted,threaded,socket,engraved.

Outer diameter (inch ):1/2’’—16’’

Thickness (mm):2.0—20.0

Length (m):1—12

The section shape:round

Country of origin:China(Mainland)

Provinces :Tianjin

Application :Structure Pipe

The production process: ERW

Certificate:CE

Surface treatment: galvanized

Whether the alloy:Non- alloy

Factory :yes

Product display

11111 1111111111 111111111

Trading information

The measuring unit:tons

Fob price:450—690

Minimum order quantity :25tons

Method of payment: L/C,D/A,D/P,T/T,Western Union

MoneyGram

Logistics information

Port :Tianjin

Supply ability:2000tons/month

Packing :P acked in bundle,suitable for sea transport(by container)

Our company

dsadas (1) dsadas (2) dav hdr

Our certifications

fasfsdfsdfsdf ffdsfgsdfsdf fdsfsdfsdggsd

Customer photo

10 4 3

FAQ

Q: Are you trading company or manufacturer ?

A: We are factory.

 

Q: What are you main market areas and countries ?

A:  We have extended our sales net to almost all over of the world, such as the Southeast Asia, Australia, America, Canada, Europe, Middle East, 

Africa and many other countries and areas.

 Q: Do you provide samples ? How long will the delivery date ?

A: Yes, generally the samples will be sent out immediately by the air express in 3~5 days,if the goods are in stock . Normally ,delivery date will be within 20 days or according to your order .  

Q: What is your terms of payment ?

A: Usually 30% as deposit ,70%before shipment bu T/T. Western union acceptable for small account ,and L/C acceptable for large amount . 

 

 

 


  • Previous:
  • Next:

  • Our Advantages :

    1.we are the source manufacturer .

    2.Our factory is near the port of Tianjin.

    3.To ensure the quality of our products, we use high quality materials and strict quality control

    Payment Term :

    1.30% deposit then 70% balance after received the BL copy
    2.100% at sight Irrevocable letter of credit
    Delivery time: within 15-20 days after received the deposit
    Certificate : CE,ISO,API5L,SGS,U/L,F/M