High Quality Construction Building Materials Galvanized Steel Pipe,Galvanized Pipe,Steel Scaffolding Pipe

Short Description:

Product Detail

Our Advantages

Product Tags

We’re going to devote ourselves to offering our esteemed shoppers with the most enthusiastically thoughtful expert services for High Quality Construction Building Materials Galvanized Steel Pipe,Galvanized Pipe,Steel Scaffolding Pipe, We wholeheartedly welcome shoppers all around the globe come to go to our manufacturing facility and have a win-win cooperation with us!
We’re going to devote ourselves to offering our esteemed shoppers with the most enthusiastically thoughtful expert services for galvanized steel pipe, Galvanized Steel Pipe For Greenhouse Frame, Round Steel Pipe, With the development and enlargement of mass clients abroad, now we have set up cooperative relationships with many major brands. We have our own factory and also have many reliable and well-cooperated factories in the field. Adhering to the “quality first, customer first, We are provideing high-quality, low-cost products and first-class service to customers. We sincerely hope to establish business relationship with customers from all over the world on the basis of quality, mutually benefit. We welcome OEM projects and designs.
The product description:

Product name Hot Dip Galvanized Steel Pipe/Pre-Galvanized Steel Pipe
Wall Thickness 0.6mm–20mm
Length 1–14mAccording to customer requirements …
Outer Diameter 1/2’’(21.3mm)—16’’(406.4mm)
Tolerance Tolerance based on Thickness:±5~±8%  
Shape Round
Material Q195—Q345,10#,45#,S235JR,GR.B-D,STK500,BS1387……
Surface treatment Galvanized
Zinc coating Pre-galvanized steel pipe :40–220G/M2Hot dip galvanized steel pipe :220–350G/M2
Standard ASTM,DIN,JIS,BS
Certificate ISO,BV,CE,SGS
Payment terms 30%T/T deposit in advance,70%balance after B/L copy;100%Irrevocable L/C at sight,100% Irrevocable L/C after receive B/L copy 20–30days
Delivery times 25days after receive ur deposits
Package
  1. Through a bundle
  2. According to customer’s requirement
Loading port Tianjin/Xingang

customer’s benefit:

  What benefits do customers get:

1.we are factory .( our price will have an advantage over trading companies.)

2.Don’t worry about the delivery date . we are sure to deliver the goods in time and quality to achieve customer satisfaction .

Product detail :

860193995952846261(1) 895577370824788430(1) 9
Thickness Length Diameter

 

镀锌带锌层(1) 热镀锌锌层(1) 1 (2)

 gi pipe  zinc coating

 HDG pipe Zinc coating

diameter detail

Different from other factories:

    1.we applied for received 3 patents .(Groove pipe ,Shoulder pipe,Victaulic pipe )

    2. Port : our factory just 40 kilometers from Xingang port ,is biggest port in the north of China .

    3.Our manufacturing equipment include 4 pre-galvanized products lines,8 ERW steel pipe product lines,3 hot-dipped galvanized process lines.

Packing and transport:

Loading picture from Nina                 常用3

Customer case:

  Australian customer purchase powder coating pre galvanized steel square tube. After customers receives the goods for the first time . Customer tests adhesive strength between the powder and the surface of the square tube .Customers test powder and square surface adhesion is small . We have meetings with customers to discuss this problem and we do tests all the time . we polished the surface of the square tube . Send the polished square tube to the heating furnace for heating . We tests all the time and discuss with customer all the time . We keep finding ways . After many tests, the final customer is very satisfied with the products. Now customer purchase a large number of products from factory every month .

Customer photos :

10 4 3

 The customer purchased steel pipes in our factory. After the goods were produced, the customer came to our factory for inspection.


  • Previous:
  • Next:

  • Our Advantages :

    1.we are the source manufacturer .

    2.Our factory is near the port of Tianjin.

    3.To ensure the quality of our products, we use high quality materials and strict quality control

    Payment Term :

    1.30% deposit then 70% balance after received the BL copy
    2.100% at sight Irrevocable letter of credit
    Delivery time: within 15-20 days after received the deposit
    Certificate : CE,ISO,API5L,SGS,U/L,F/M