hot dip galvanized steel pipe

Short Description:

  •  Place of Origin:Tianjin, China
  •  Standard:GB/T3091-2001,BS1387-1985,DIN EN10025,EN10219,JIS G3444:2004,ASTM A53 SCH40/80/STD,BS-EN10255-2004;                                                                                                                            
  •  Grade:Q195,Q235,Q345,S235JR,GR.B-D,STK500;
  •  Surface:Pre-galvanized,Hot dip galvanized,Electro galvanized,Black,Painted,Threaded,Socket,Engraved;
  • Usage:Construction,Furniture,Water supply pipe, Gas pipe, Building pipe,Machinery,Coal mines,Chemicals,Electricity,Rrailway,Vehicles,Automotive industry,Highways,Bridges,Containers,Sports facilities,Agricultural,Machinery,Petroleum Machinery,Exploration machinery,Greenhouse construction;                                                                                                            
  •  Section Shape:Round
  • Outer Diameter:19 - 114.3 mm
  • Thickness:0.8-2.5mm

Product Detail

Our Advantages

Product Tags

1.product name :

Hot dipped galvanized steel pipe

2. Product information:

Steel Grade:Q195–Q345,S235JR,S275JR,S355JR,GR.B-D,STK500

Standard:GB/T3091–2001,BS1387–1985,DIN EN10025,EN10219,JIS G3444:2004,ASTMA53 SCH40/80/STD,BS-EN10255-2004

Surface Finish:hot dipped galvanized ,electro galvanized ,black,painted,threaded,socket,engraved.

Outer diameter (inch ):1/2’’—16’’

Thickness (mm):2.0—20.0

Length (m):1—12

The section shape:round

Country of origin:China(Mainland)

Provinces :Tianjin

Application :Structure Pipe

The production process: ERW

Certificate:CE

Surface treatment: galvanized

Whether the alloy:Non- alloy

Factory :yes

Port :Tianjin

3. product pictures :

4fc7b55e84a2c23857fb8b2f36cf2c5 4abc3474d5605996ab000e42f94bfb8 3fd7f312f89f91edc99990edf3538dd 3da1b642443cb7b517a650718ca78ae

 

4. customer picture :

 

 3       4      16

 

5.Product use :

timg12    763c0b9fc703fa67d54fd74a4704edc    timg


  • Previous:
  • Next:

  • Our Advantages :

    1.we are the source manufacturer .

    2.Our factory is near the port of Tianjin.

    3.To ensure the quality of our products, we use high quality materials and strict quality control

    Payment Term :

    1.30% deposit then 70% balance after received the BL copy
    2.100% at sight Irrevocable letter of credit
    Delivery time: within 15-20 days after received the deposit
    Certificate : CE,ISO,API5L,SGS,U/L,F/M